Progress of Work So Far

Progress of Work So Far Made and the Current Status of the Project

  • NWDA has completed:

  • 137 water balance studies of basins/sub-basins
  • 71 water balance studies at diversion points
  • 74 topo-sheet studies of storage reservoirs
  • 37 topo-sheet studies of link alignments and
  • 31 pre-feasibility studies of links out of which 30 links have been identified for preparation of feasibility reports.
  • Six feasibility reports have been completed
  • Grants-in-aid released to NWDA Rs 1.049 B
  • Link proposals envisage additional irrigation benefits of 35 M Ha
  • Preliminary assessment indicates 200-250 BCM of additional water by transferring water from surplus basins to water-short basins


Brahmaputra River Basin
Click for Large Image

  • Since March 1997, NWDA works of the geo-technical investigation comprising of field investigations and Laboratory tests for characterisation of foundations of structures for preparation of Manos-Sankos-Teesta-Ganga (MSTG) link Canal 

  • NWDA had prepared pre-feasibility report of MSTG Link for transferring the surplus flows of Manas and Sankosh rivers, tributaries of Brahmaputra River and intermediate rivers up to Teesta into the river Ganga upstream of Farakka   

  • Part of this surplus water is proposed for augmentation of river Ganga to meet the lean water requirement of Calcutta Port 

  • At present the above link project is under Survey and Investigation stage for preparation of feasibility report, which is programmed to be completed by the year 2003

Go top

 

Source: Presentation made by A.N.H. Akhtar Hossain PEng,  Engr. S. M. Mahbubur Rahman and  Engr. S.H.M. Fakhruddin at Press Club Dhaka.

 

Inter Basin Water Transfer link Project

Background
Resolution
Order
Press Release
Address by President of Indian
Speech of the Prime Minister of India
Order of the Supreme Court
Time Table
National Commission
Task Force
TOR of Task Force
Cost of The Project
Details of Proposed Links

 

 

Home Feedback Contact us